What We Do

Services

Everything we do, broken down by job, from the first footing to a worn-out railing.

Home › Services

Everything we take on

Every job below is one we do ourselves across Madison.

Deck Installation

We frame new decks with joists set 16 inches on center and footings poured below the frost line, which runs about 42 inches deep in the Madison area. You get a choice of pressure-treated lumber, cedar or composite decking, and we pull the permit before anyone touches a shovel.

Deck Repair

Soft or spongy boards, a railing that moves, stairs that bounce, we see all of it. Most repairs come down to a rotted ledger connection, rusted joist hangers or a post that was never set on a real footing, and we fix the cause, not just the symptom.

Deck Staining & Sealing

UV and standing water are what actually break down a deck surface, not foot traffic. We power wash, let the wood dry fully, then apply an oil-based or water-based stain depending on the wood species and how much sun that side of the house gets.

Custom Deck Design

Multi-level decks, built-in benches, pergolas and stairs that land exactly where you want them in the yard. We draw it out and talk through board direction and railing style before we order a single piece of lumber.

Composite Decking Installation

Composite boards like Trex or TimberTech skip the yearly staining and won't splinter, but they still require correct joist spacing underneath or they'll sag between supports. We follow the manufacturer's spacing spec exactly, since it's usually tighter than for wood.

Deck Railing Repair & Installation

Wisconsin code requires balusters spaced so a 4-inch sphere can't pass through, and a lot of older decks don't meet that anymore. We rebuild railings to spec, with posts bolted through the rim joist instead of just toe-screwed in.

Deck Resurfacing

If the frame underneath is still solid, we strip off the old decking and swap in new boards without rebuilding the whole structure. It's a faster, cheaper way to get a deck that looks new when the real problem is just the surface.

Deck Framing & Structural Repair

Joists, beams and ledger boards take the real load, and that's where rot and rust actually cause failures. We sister rotted joists, replace corroded hardware, and re-flash the ledger board where it meets the house so water stops getting behind the siding.

Screened Porch & Deck Additions

A lot of our clients want part of the deck screened in to deal with mosquitoes without losing the open-air feel entirely. We frame the screen walls into the existing deck structure so it reads as one build, not an add-on.

Deck Demolition & Removal

Old decks with rotted framing sometimes aren't worth saving, and trying to repair around bad joists just costs more over time. We tear it out, haul off the old lumber and nails, and leave the site ready for the next build.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Madison, WI

Deck installation and repair covers Madison and the towns within about 50 miles of it.

Madison, WI
Janesville, WI
Beloit, WI
Sun Prairie, WI
Fitchburg, WI
Middleton, WI
Verona, WI
Stoughton, WI
Waunakee, WI
DeForest, WI
Oregon, WI
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Do I need a permit to build a deck in Madison?
Most deck construction in the Madison area requires a building permit, especially for decks attached to the house or built more than 30 inches above grade. Permit applications typically require a site plan showing footing locations and the deck's distance from property lines.
How long does it take to build a deck?
A straightforward single-level deck usually takes one to two weeks from the first footing to the last railing baluster. Multi-level decks, screened additions or anything with custom stair layouts can run three to four weeks depending on weather delays.
Can a deck be built on a budget?
Pressure-treated pine keeps material cost down while still meeting code for framing and decking, and simplifying the railing design or skipping a second level cuts labor time. The quote breaks out material and labor separately so it's clear where the budget can flex.
Do you guarantee the work on a new deck?
Workmanship on framing, decking and railings is covered under warranty, and lumber or composite decking carries its own manufacturer warranty against defects. Details on warranty length and what's covered are spelled out in the written quote before work starts.
Who do I talk to during the project?
One point of contact handles scheduling, material questions and any changes that come up once the deck is underway, so there's no runaround between a sales person and the crew. That contact is reachable by phone throughout the job.
What decking material should I pick?
Pressure-treated pine is the cheapest option but requires staining every two to three years to hold up. Cedar looks better longer without staining but costs more, and composite decking like Trex or TimberTech costs the most upfront but requires almost no annual maintenance.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during a deck build since work is concentrated around the footprint of the new or existing deck. Materials and equipment do need a staging area nearby, usually the driveway or a section of lawn close to the work site.
What do I need to do to get the site ready before work starts?
Clearing furniture, planters and grills off an existing deck before demo day keeps things moving. For new builds, marking the location of sprinkler lines, buried cable or dog fence wire ahead of time avoids hitting them during footing excavation.
What if you find rot or damage once the old deck comes off?
Hidden rot in ledger boards, rim joists or support posts sometimes isn't visible until the old decking is stripped away. When that happens, the scope and cost get discussed before any replacement framing goes in, rather than being a surprise on the final bill.
How do I maintain a deck after it's built?
Pressure-treated and cedar decks require a fresh coat of stain or sealant every two to three years, sooner if the deck gets direct afternoon sun. Composite decking just requires an occasional wash with soap and water, but gaps between boards should stay clear of leaves and debris so water keeps draining.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (608) 404-7308